Hydraulic schemes and HEPP improvement and rehabilitation
     
  • Dam heightening
  • Dams, appurtenant structures, and penstocks rehabilitation
  • Static and dynamic back analysis
  • Structural measures against long term concrete chemical reaction effects
 
         

Study of Ekbatan dam heightening (from 53 to 78 m), Iran, 2000-02
 
Enguri arch dam, 271 m high and 1300 MW power station, improvement of the grout curtain and rehabilitation of the headrace tunnel, Georgia, 1999-02
 
Luzzone dam heightening (from 208 to 225 m), Switzerland, 1988-98
       

Spitallamm dam, 114 m high, 23 m heightening project, Switzerland, 2005-in progress
 
Peuffeyre, replacement of the penstock, 1100 m long, Switzerland, 2003-04
 

 

       