



| Hydraulic schemes and HEPP improvement and rehabilitation | ||||
|
||||
![]() Study of Ekbatan dam heightening (from 53 to 78 m), Iran, 2000-02 |
![]() Enguri arch dam, 271 m high and 1300 MW power station, improvement of the grout curtain and rehabilitation of the headrace tunnel, Georgia, 1999-02 |
![]() Luzzone dam heightening (from 208 to 225 m), Switzerland, 1988-98 |
||
![]() Spitallamm dam, 114 m high, 23 m heightening project, Switzerland, 2005-in progress |
![]() Peuffeyre, replacement of the penstock, 1100 m long, Switzerland, 2003-04 |
|||
|
||||

© STUCKY LTD
Rue du Lac 33 | P.O. Box
1020 Renens VD 1 | Switzerland
Tel. +41 (0)21 637 15 13
Fax +41 (0)21 637 15 08